Camas WWTP
Name: Camas WWTP
Location: Camas, WA
Status: Completed
Type: Waste Water Treatment Plants
Owner: City of Camas
Engineer: Gray & Osborne, Inc.
Camas Waste Water Treatment Plant consists of:
-The expansion to the existing wet well and the installation of a new wastewater grinder.
-Headworks modifications to include the installation of a new influent fine screen.
-Installation of a new primary clarifier scum pump in an existing wet well.
-Aeration basin modifications to include modifications to the existing internal walls, installation of new fine bubble diffuser membranes, and new instrumentation.
-UV Disinfection building modifications to include the installation of a new bank of UV lights and a new non-potable water pump.
- Modifications of the Aerobic Digester No. 2 to Septage/Centrate/WAS storage tanks and Scum Concentrator Tank complete with new positive displacement aeration blowers and pumping equipment.
-Equipment building modifications to include the installation of a new aeration basin blower, new aeration system instrumentation and controls, new thickener feed pumps, a new scum concentrator pump, and flow meters.
-Modifications of the existing Sludge Storage Building to a Biosolids Drying Building to include the installation of a new Biosolids Drying System and motor control centers.