MCCLURE AND SONS, INC.
P: 425-316-6999 | F: 425-316-6789
Invoices: accounting@mcclureandsons.com

Bids: bids@mcclureandsons.com


Home > Skip Navigation LinksProjects > Industrial

Back to Project List

Ryerson Base Lift Replacement

Name: Ryerson Base Lift Replacement
Location: Seattle, WA
Status: Completed
Type: Industrial Facilities
Owner: King County
Engineer: KPFF Consulting Engineers
Project Amount: $4,190,000
The work of this project is to install temporary facilities, the demolition of existing structures, the furnishing and installing of vaults and lifts, and the furnishing and installing of electrical systems. The build of temporary facilities include demising walls, dust control structures, hydraulic lift systems, handling areas, and construction staging areas. The demolition includes concrete structures, hydraulic lifts, and electrical systems. And lastly, the installing of the vaults includes eight new vaults to house the custom-fabricated hydraulic lifts that include integral hydraulic pressure units and control systems. 
Share this on:
  • Facebook
  • Twitter
  • DZone It!
  • Digg It!
  • StumbleUpon
  • Technorati
  • Del.icio.us
  • NewsVine
  • Reddit
  • Blinklist
  • Add diigo bookmark