The Kingsgate Booster Pump Station and Pipeline project includes the construction of a new booster pump station and modifications to the existing 1 million gallon reservoir. This project also consists of constructing a flowmeter vault, emergency generator and storm water detention pond. The off-site work entails the installation of 700 LF of 12-inch ductile iron water main pipeline, 350 LF of 8-inch PVC sanitary sewer, modifications to existing PRV vaults and new PRV vault.