Sumner Central Well Development

Name: Sumner Central Well Development
Location: Sumner, WA
Status: Completed
Type: Water & Wastewater
Owner: City of Sumner Public Works
Engineer: RH2 Engineering
Project Amount: 5,003,125

This project consists of installation of a 1,050 gpm pump and motor and construction of a treatment facility for the removal of manganese. The treatment system will include: chlorination for the oxidation of manganese and regeneration of the IMAX filter media, with the removal of manganese in a pressurized filter vessel containing IMAX media; sulfide removal in a GAC contactor system; a rechlorination system for removal of ammonia and providing a free chlorine residual; and breakpoint reaction contact time in a large diameter pipeline on the site. Other systems include a backwash and process residuals waste pump station; electrical panels and controls for filter and process automation; and backup power supply. The treatment facility will be constructed of a short wall of CMU blocks with a prefabricated metal building on top and metal trusses and metal roof. Site work will generally include raw and treated water utilities; power, signal, sewer and storm utilities; additional fencing; driveway; site grading; security improvements; and minor landscaping. Power supply and automatic control improvements will also be included in this project.

Share this on:
  • Facebook
  • Twitter
  • DZone It!
  • Digg It!
  • StumbleUpon
  • Technorati
  • Del.icio.us
  • NewsVine
  • Reddit
  • Blinklist
  • Add diigo bookmark