This project located in Eagle Point, Oregon included furnishing and installing a 1.6 MG Glass Fused Water storage tank and all equipment to run the water storage tank including; mixing system, valves, pumps, controls, flow meter, concrete vaults and level inducer. Complete installation of all water distribution piping included, but not limited to, temporary facilities and connections, all connections to existing waterlines, complete testing and disinfection of new water lines, re-connection and relocation of existing water services located along the proposed routes were performed. Also installed was all electrical and instrumentation to the project.
Schedule 2 of the project consisted of by-passing, relocation and upgrade of Bellerive Pump Station to the new Riley Road location. Upgrades included new pumps and motors, constructing a by-pass system and maintaining all potable water the current pump station provided to the city while the relocation process was in progress. A new back up generator at the Riley Road location was installed.