MCCLURE AND SONS, INC.
P: 425-316-6999 | F: 425-316-6789
Invoices: accounting@mcclureandsons.com

Bids: bids@mcclureandsons.com


Home > Skip Navigation LinksProjects > Water & Wastewater

Back to Project List

Everett WPCF Phase B-1

Name: Everett WPCF Phase B-1
Location: Everett, WA
Status: Completed
Type: Waste Water Treatment Plants
Owner: City of Everett

Improvements at the City of Everett Water Pollution Control Facility (WPCF) included: installing surface aerators and related electrical work for Aeration Cell No. 1; providing and installing a sheet pile baffle wall in Aeration Cell No. 2; providing and installing approx 300 LF of HDPE piping at the North Effluent Pump Station along with modifications to the discharge piping at the pump station; provide and install HDPE drain piping and sump pumps at the Headworks Odor Control Building. This project also required extensive dewatering work.

Share this on:
  • Facebook
  • Twitter
  • DZone It!
  • Digg It!
  • StumbleUpon
  • Technorati
  • Del.icio.us
  • NewsVine
  • Reddit
  • Blinklist
  • Add diigo bookmark