The City of Portland SE 83rd Avenue Pump Station project consisted of the construction of an 8-foot diameter wet wall, sewage pumps and motors, valves, flow meter and biofilter vaults with connecting piping, generator shelter, onsite generator with an automatic transfer system, pump station building with restroom and ecoroof, pervious pavement, drainage piping, influent gravity sewer, force main, and site fencing.