This project consisted of fabrication of a 1,400' concrete breakwater for the Bremerton Marina Expansion Project. The breakwater is made of 12 individual polystyrene foam filled, reinforced and post-tensioned concrete float bodies that were assembled into three bodyassemblies by the fabricator and towed via tugboats to the installation site. Also included in project was all equipment, material, labor, materials testing, quality control and ballistic calculations.