The following key elements were provided, installed or commissioned for the project:
Removal and disposal of existing designated fender structures, installation of a gangway from Float B to Float A, ADA Access Ramps for Berths 2 and 3, foundation for above ground fuel tanks, fuel storage tank and distribution system, fuel tank fence and bollards, sewage removal system, vertical ladder and life ring cabinet installation, signage, fire protection system maintenance, power supply to equipment and lighting, equipment controls, lighting fixtures, poles and bollards, marine fenders, cleats, fuel boom and fuel spill kits and line thrower.