The Sandpoint Boat Launch project consisted of: the placement of imported shoreline material including beach gravels, rock riprap, anchored logs, erosion control, installation of new steel pilings, pre-cast concrete launch ramp, steel beam guide system, structural and log boom pilings and floating docks. All construction was performed over water under SEPA and shoreline guidelines.